Skip to main content
Join CMKC members for a complimentary virtual event on December 10, 11am ET: CM MythBusters: https://bit.ly/3YXJynA. This is a fantastic opportunity to connect, collaborate, and debunk common myths about continuous manufacturing!
18.117.166.193

Tags: Time dependency

All Categories (1-1 of 1)

  1. Process monitoring and evaluation of a continuous pharmaceutical twin-screw granulation and drying process using multivariate data analysis

    09 Jun 2023 | Contributor(s):: Silva, A. F., Vercruysse, J., Vervaet, C., Remon, J. P., Lopes, J. A., De Beer, T., Sarraguca, M. C.

    The present study aims at acquiring an in-depth process knowledge about a twin-screw granulation and fluid bed drying process performed on the commercially available continuous line. Batch Statistical Process Monitoring (BSPM) principles are used to describe and monitor the variables with a...